Reference | NG01009076 |
Date | 8/15/2011 |
Location | Africa |
Scope | Operation and maintenance of water facilities in the western division This contract is required to: - Maintain 100% availability of water supply in assigned SPDC locations - Maintain 100% availability of all water treatment plants at specified locations - Maintain 100% availability of water lines in base locations supplying water to about 500 buildings. - Maintain 100% availability of water to barges supplying the swamp locations. - Carry out routine maintenance activities on all water production facilities in the base locations, including but not limited to storage vessels, air compressors, blowers and pumps. - Supply materials and tools required for the daily operation of the water treatment plants, water lines, valves, air compressors, blowers and surface pumps. - Carry out maintenance activities on all water flow lines and associated valves of sizes ranging from 1 ½” to 6” at specified locations - Carry out annual maintenance of water treatment plants, overhead tanks. - Maintenance of the water production facilities in all field locations in the Western Division including but not limited to: a) Managing of store at Ughelli Production Centre (UPC) b) Change-out of faulty submersible pump with motorized crane c) Change-out of faulty submersible pump with a Tripod d) Water Supply to drilling locations and campsites e) Retrieval of utility materials from drilling location/campsite f) Cleaning of existing water wells g) Integrity checks on boreholes h) Repair of leaking waterlines in process stations i) Hook-up of new water boreholes j) Threading of pipes k) Provision of alternative power supply l) Provision of security watch over utility materials Contract Duration: 2 years + I year extension option |