Reference | STC/OPN/881/11 |
Date | 9/15/2011 |
Location | Middle East |
Scope | Contractor shall be responsible to carry out all civil works such as manually excavate a shallow cable trench (300 mm depth x 300 mm width x 1,650 meter long), re-instate (backfill) the shallow cable trench accordingly for two (2) identified locations and lay two (2) new cables supplied by the company (6C x 6 mmsq XLPE/PVC/SWA/PVC) in the shallow underground cable trench for both locations. Excavation and laying 2 inter-trip cables. |
Documents Price | QR. 150 |