Reference | 57.11.9018.01 |
Date | 9/11/2011 |
Location | Middle East |
Scope | Smokeless burner forwaste oil and gas, surge tank. 1. Specificate of Burner - Portable. - Skid mounted. - Working pressure = 1440 psi. - Capacity = 10000 bbl/D. - Emulsion capacity = 50% oil/water suspension. - Gas capacity = 5 MMSCFD @ 300 psi. - Check valve air line = 3" water type, 1440 psi. - Check valve oil line = 3" water type, 1440 psi. - Oil line connection = 3" fig. 602 female. - Air line connection = 3" fig. 602 female. - Ignition system = Butane with electric ignition or any recommended (remote operated). - Surface coating = Sand blasting, coating inorganic zinc primer (0.3 – 0.4) mm, epoxy resin intermediate coat (0.4 – 0.6)mm , urethane acrylate coat (0.4 – 0.6)mm. Color: Navy Blue. 2. Specification of Burner control Manifold:- Ball valve 3" class 600 QT 4 Ball valve 2" class 600 QT 2 Ball valve 1" class 600 QT 2 Check valve 3" class 600 QT 3 Check valve 2" class 600 QT 1 Union 3" fig 602 QT 8 Union 2" fig 602 QT 1 Union 1" fig 602 QT 3 Surface coating: sand blasting, coating inorganic zinc primer (0.3 – 0.4)" mm, epoxy resin intermediate coat (0.4 – 0.6) mm , urethane acrylate coat (0.4 – 0.6)mm. Color: Navy Blue. Note: the manifold must have a chock to Restrict the oil flow rate 1/64" division On both side. 3. Surge Tank Technical Tank:- Working pressure 150 psi Working temperature 0 – 100 C? Vessel size 96" * 120" seam to seam Capacity 100 bbl Shell thickness 12 mm Head thickness 14 mm - Piping crude inlet line = 3" fig 602 TH Oil outlet line = 3" fig 602 wing Gas outlet line = 3" fig 602 wing Vent outlet line = 3" fig 602 wing Drain outlet line = 3" fig 602 wing The vessel to be installed on an oil field type skid with all manifolds and accessories to be within the skid dimension. Painting and coating Vessel, skid, pipe work valve and instruments etc. to be externally painted, instrument and valves to be supplied painted in manufacturer's standard. Spare parts - Spare parts for all items in this inquiry required. Training Will be required for 2 persons. (1 Engineer, 1 Technician) for 7 days except traveling days. Note: 1- All equipments must be sour services. 2- Country of origin should be from (USA, Canada, Europe, China) |
Bid Bond | 1% from Submitted Prices |
Offer Validity | 150 days |
Documents Price | ID 150 000 |