Smokeless Burner Forwaste Oil & Gas, Surge Tank
Vessels, Tanks
Reference 57.11.9018.01
Date 9/11/2011
Location Middle East
Scope Smokeless burner forwaste oil and gas, surge tank.

1. Specificate of Burner
- Portable.
- Skid mounted.
- Working pressure = 1440 psi.
- Capacity = 10000 bbl/D.
- Emulsion capacity = 50% oil/water suspension.
- Gas capacity = 5 MMSCFD @ 300 psi.
- Check valve air line = 3" water type, 1440 psi.
- Check valve oil line = 3" water type, 1440 psi.
- Oil line connection = 3" fig. 602 female.
- Air line connection = 3" fig. 602 female.
- Ignition system = Butane with electric ignition or any recommended (remote operated).
- Surface coating = Sand blasting, coating inorganic zinc primer (0.3 – 0.4) mm, epoxy resin intermediate coat (0.4 – 0.6)mm , urethane acrylate coat (0.4 – 0.6)mm.
Color: Navy Blue.

2. Specification of Burner control Manifold:-
Ball valve 3" class 600 QT 4
Ball valve 2" class 600 QT 2
Ball valve 1" class 600 QT 2
Check valve 3" class 600 QT 3
Check valve 2" class 600 QT 1
Union 3" fig 602 QT 8
Union 2" fig 602 QT 1
Union 1" fig 602 QT 3
Surface coating: sand blasting, coating inorganic zinc primer (0.3 – 0.4)" mm, epoxy resin intermediate coat (0.4 – 0.6) mm , urethane acrylate coat (0.4 – 0.6)mm.
Color: Navy Blue.

Note: the manifold must have a chock to Restrict the oil flow rate 1/64" division On both side.

3. Surge Tank
Technical Tank:-
Working pressure 150 psi
Working temperature 0 – 100 C?
Vessel size 96" * 120" seam to seam
Capacity 100 bbl
Shell thickness 12 mm
Head thickness 14 mm
- Piping crude inlet line = 3" fig 602 TH
Oil outlet line = 3" fig 602 wing
Gas outlet line = 3" fig 602 wing
Vent outlet line = 3" fig 602 wing
Drain outlet line = 3" fig 602 wing
The vessel to be installed on an oil field type skid with all manifolds and accessories to be within the skid dimension.

Painting and coating
Vessel, skid, pipe work valve and instruments etc. to be externally painted, instrument and valves to be supplied painted in manufacturer's standard.

Spare parts
- Spare parts for all items in this inquiry required.

Training
Will be required for 2 persons. (1 Engineer, 1 Technician) for 7 days except traveling days.

Note:
1- All equipments must be sour services.
2- Country of origin should be from (USA, Canada, Europe, China)

Bidding Information

Bid Bond 1% from Submitted Prices
Offer Validity 150 days
Documents Price ID 150 000
Vessels, Tanks
Related Prooducts: Vessels, Tanks Barrels & Containers General Metal Pressure Vessels Metal Tanks Plastic Pressure Vessels Steel Plates Vessels Internals
Related Tenders: Barrels & Containers General Metal Pressure Vessels Metal Tanks Steel Plates Vessels Internals

Related Articles

For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.