Reference | BID901073 |
Date | 9/25/2011 |
Location | Africa |
Scope | provision of personnel and equipment required for the engineering, equipment, preparation and operation of the jetting and post jetting sections drilling fluids and products supply services for the second batch of riser-less section onwards onboard the West Capella Drilling Unit, for Usan development or any other additional permit area in which company has the right to conduct petroleum operations within the country. In order to drill and complete the field development wells, the contract duration shall be for two (2) firm years plus one year extension option. |