Reference | BID901212 |
Date | 10/20/2011 |
Location | Africa |
Scope | provision of Coiled Tubing Services for the Project. Service includes the provision of Personnel and Equipment required for the engineering, equipment, preparation, operation and maintenance of the Coiled Tubing and Nitrogen Services onboard the West Capella Drilling Unit, for the field development or any other additional Permit Area in which company has the right to conduct petroleum operations within the country. The possible contingency operations are; - Reservoir stimulation / treatment operations - Running / pulling completion plugs - Opening Isolation and Control Valves - Well Kill Operations - Tubing Cleaning - Sand clean out - Fishing inside tubing - Perforation - Cutting / Milling - Nitrogen pumping - Production logging test (PLT) In order to drill and complete the field development wells, the contract duration shall be for two (2) firm years plus one (1) year extension option. |