Reference | LTC/OPN/1663/11 |
Date | 11/20/2011 |
Location | Middle East |
Scope | Fabrication of around 1700 numbers piping spools (of size equal to or less than 1 inch) at contractor’s shop, testing and erection of the same inside Company plant. All the work need to be completed within 8 to 10 weeks before end March 2012. All interested contractors should have local fabrication shop facility. |
Documents Price | QR 500 |