Reference | QEN-12-645 |
Date | 1/15/2012 |
Location | Middle East |
Scope | Carry out Foundations modification works to strengthen the following static tall structures in Qalhat plant as per the wind speed assessment and as required for code compliance to revised wind speed of 55 meters/ second. 1- 100M Vapour Flare Stacks A-6206 2- 260M Liquid Flare Stacks A-6212 3- HTF Furnace/ Heaters 1/2/3-F4101 4- Pipe Rack PR1 in Unit 6200 5- Pipe Rack PR2 in Unit 6200 Contractor will be supplied with Detail design packages for all above modifications to the existing foundations and the scope is limited to construction only. |