Reference | LTC/Q34/1882/12 |
Date | 4/1/2012 |
Location | Middle East |
Scope | Contractor shall collect technical data for installed steam traps in all QG3&4 asset plant using TLV Trap Man Model TM5-EX analyser; Verify/correct the data by visiting the plant and visually inspect each trap. Prepare database, compatible with MS Access/Excel and provide suitable solution for non-functional or mis-functional traps. |
Bid Bond | QR 50,000 |
Documents Price | QR 500 |