Egypt Zones accountACCOUNT
Auto Sampling System Change
Site Survey
Reference 4320/2012
Date 5/24/2012
Location Middle East
Scope Contractor/ Fast-loop analysis Manufacturer’s engineering work shall include the
1 . Site Survey shall be done by the contractor to choose the adequate location for the new fast-loop sampling and analysis systems
2 .Contractor shall make all installation for the 4th sampler units and any required piping or mechanical changes and also make the necessary change in the control panel for ABOT
.Contractor shall make all installation for the two sampler units and any required piping or mechanical changes and also make the necessary change in the control panel for
KAAOT
3 . Development of P&I Diagram to cover the new changes in the metering system .
4. Design / Fast-loop analysis system Skid to cover the requirement of work at ABOT ,
KAAOT
5 . Design of Fast-loop analysis system Cubicle (internal instrument arrangement, wiring, etc.). The Fast Loop analysis system is comprise of Power assisted mixer, grab sampling, B&SW and online Density. These sampling system is to fully comply to API 8.2 and ISO
6 .Contractor shall make any required updates to the software of Danpac system, S600
flow computers , and Omni flow computer .
7. All significant parts should be designed with Dual Redundancy in mind to insure that the sampling system is never off line.

Bidding Information

Bid Bond 1% from Submitted Prices
Site Survey
Related Prooducts: Site Survey Aerial Survey General GIS Services GPS Services Land Survey Marine Survey Site Survey
Related Tenders: General GIS Services GPS Services Land Survey Marine Survey Site Survey

Related Articles

For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.