Reference | PROC-FC/CB/PROJ/521/2012 |
Date | 6/9/2012 |
Location | Asia |
Scope | 1- Supply of gas/oil separators 1.1 Skid Mounted 3-Phase Horizontal Type “K” - test separator Package (V-3901) as per data sheet 165-4-DSM-008, Specification 165-4-SPM-006 and PID Dwg.No 165-4-PID-033, Sh.2 of 2. 1.2 Skid Mounted 3-Phase Horizontal Type “T” - test separator Package (V-4901) as per data sheet 165-4-DSM-009, Specification 165-4-SPM-006 and PID Dwg.No 165-4-PID-033, Sh.2 of 2. 1.3 Skid Mounted 3-Phase Horizontal Type “K”- Production separator Package (V-4201) as per data sheet 165-4-DSM-010, Specification 165-4-SPM-006 and PID Dwg.No 165-4-PID-035, Sh.2 of 3. 1.4 Skid Mounted 3-Phase Horizontal Type “T”- Production separator Package (V-5201) as per data sheet 165-4-DSM-011, Specification 165-4-SPM-006 and PID Dwg.No 165-4-PID-035, Sh.1 of 3. 2 - Start-up & commissioning spares List (with item - wise price) to be attached 3 - Spares parts for two (02) years continuous operation List (with item - wise price) to be attached 4 - Inspection expenses of company / consultant representatives (Please provide details as per relevant clause of itb) 5 - Third party inspection agency charges (a) 6 - Commissioning & testing charges (manday basis) (b) 7 - Installation expert charges (manday basis) (b) |
Bid Bond | 30,000 US$ |