Egypt Zones accountACCOUNT
Provision of Various Completions Services
Well Completion, Logging, Workover
Reference BID902081
Date 6/25/2012
Location Africa
Scope The scope of work consists of provision on a call-out basis, personnel and equipment required to accomplish, as a minimum, the following:

A- Cased Hole Logging Services:
The scope of work covers production logging, casing/tubing integrity testing, cement evaluation tools , tubing and casing perforation, pipe recovery services, plug and packer setting, gyroscopic surveys, noise/temperature/pressure logging.

B- Effluent Water Treatment Services:
The scope of work covers Storage of Pumping Services Equipment and Accessories, Testing and loading out the GOODS and company supplied items for offshore/onshore operations, providing specialist assistance during pumping operations. Providing an Engineering follow up during the pumping operations.

C- HD Wireline Fishing Services:
The scope of work covers: Provision of Heavy Duty Fishing Unit(s) to perform Heavy Duty Fishing job in Oil and Gas wells with high deviation or high dog legs. The pulling performance of braided line would allow retrieval of cables and devices stuck in well, when slickline unit (0.125) cannot be used due to the limitation of pulling capacity at 2000 Lbs.

D- Mechanical Wellbore Cleanup Services:
The scope of work covers: Running and servicing pre completion well bore cleaning tools to comply with the COMPANY well program. A rigorous multi stage clean-out procedure (including the use of displacement pills along with scrapers, and brushes) will be used to optimize wellbore and fluid cleanliness, while minimizing rig time required for clean out operations.

E- Slickline Services:
The scope of work covers: use various diameters of wire (0.092, 0.108, 0.125, and) to run or pull different devices in wells and other services including Tubing Control, Top Sediment / Top Liquid, Scrapping, Gaslift Design, Setting Operations for different devices, SCSSSV installation, Running BHP surveys

f. High Pressure Pumping Services:
The scope of work covers: provision of High Pressure Pumping with Modular Pumps for acid jobs and diesel pumping, during completion and workover operations. The contract is estimated for duration of two years firm with an optional extension period of one year.

Bidding Information

Well Completion, Logging, Workover
Related Prooducts: Well Completion, Logging, Workover Formation Evaluation General Geological, Geophysical Geophysical Contractors Mud Logging Reservoir Engineering & Recovery Methods Seismic survey Well Completion, Logging, Workover
Related Tenders: Formation Evaluation General Geological, Geophysical Geophysical Contractors Mud Logging Reservoir Engineering & Recovery Methods Seismic survey Well Completion, Logging, Workover

Related Articles

For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.