Reference | 36/2012 |
Date | 8/15/2012 |
Location | Middle East |
Scope | The supply shall include final designing, drawing, manufacturing, data sheets, inspection, testing, packaging and shipping of /8/eight skid mounted three phases horizontal pressure separators, completed with interconnecting piping, tubing and instrumentation…etc The separator should include – but not limited – the following: 1- Nozzles 2- Manholes with davits. 3-Internals 4- Supports & saddles 5- Skid bases 6- All necessary (man ways, Saddles, ladder & platform, handrails and grating) with cages to enable anyone easy access to each part of separator for maintenance. 7- Assembly interconnecting piping & tubing to skid edge with suitable flange ends. 8- All Piping, valves, safety relief valve, pipe fittings, tubing, nuts, bolts, studs & gaskets. 9- Instrumentation and control equipments. 10- Lifting lugs 11- External painting 12- Internal coating 13- Companion flanges, studs, nut and gaskets for all skids edge nozzles 14- Anchor bolts for foundation. |
Bid Bond | Euro 50000 |
Offer Validity | 180 days |
Documents Price | Euro 50 |