Reference | 04/2013 |
Date | 3/7/2013 |
Location | Africa |
Scope | Replacement of 16 "main cold vent carbon steel line with new cold vent 16" GRP. Replacement of 10" holding pipes from tanks (ST210, ST211) to the bund wall with new 10 " Epoxy Lined Carbon Steel and connected to the main vent line with same size of GRP. Replacement of 6" holding pipes from tank (ST202 with new 10“ Epoxy Lined Carbon Steel to the bund wall with new 10 " Epoxy Lined Carbon Steel and connected to the main vent line with same size of GRP. Procure ,install and replacement all necessary valves, flame arrestors and all the equipments need to perform the work. Location of the Work: Ghani Main Station |
Bid Bond | 4,500 LD |