Reference | LT13102300 |
Date | 3/14/2013 |
Location | Middle East |
Scope | Contractor shall supply all materials, labour, services, supervision, testing devices, equipment, tools, consumable materials and each and every item of expense necessary for the performance of (EPIC) design, detailed engineering, procurement and supply, installation, testing and commissioning of the following Air Conditioning Units at QP Refinery, Mesaieed: Part I: Performance of Design, detailed engineering, procurement and supply, installation, testing and commissioning (EPIC) of the additional new Air Conditioning Units to Offset Climate Change. Part II: Performance for Modification to Existing Laboratory Ventilation. in Various Locations within the Refinery Operational Areas, all complete with all electrical works. |
Bid Bond | QAR 85,000.00 |
Documents Price | QAR 200.00 |