| Reference | 08/2013 |
| Date | 3/17/2013 |
| Location | Africa |
| Scope | General Description of the Work: Replace the existing above ground 16" relief line. install a new (16") relief line from Sirtica station (8") relief valve to Tie-in No (6) adjecent to tank (3). Installation will include (8") temporary relief line. |
| Bid Bond | 4,500 LD |