Reference | 35-13-4442 |
Date | 5/26/2013 |
Location | Middle East |
Scope | SOC intend to purchase condensate gathering system to gas flaring system at Bin Umer degassing station. The function of this system is to gather condensates and/or rejected carryover from each flare lines, where such materials are collected transferred automatically to drainage system. Specifications of knock out drums a– 1st stage gas skid mounted knock out drum Design temp. min/max: -5/80 c Design press 15 barg Capacity: 5 m3 Gas inlet pipe size: 10" Gas outlet pipe size: 10" Liquid outlet pipe size: 3" Drain: 3 " Utility conn. : 2’ Lshl: 3" Lshh: 3" Pressure indicator: 1" b- 2nd stage gas skid mounted knock out drum Design temp. min/max: -5/80 c Design press: 10 barg Capacity: 3 m3 Gas inlet pipe size: 10" Gas outlet pipe size: 10" Liquid outlet pipe size: 3" Drain: 3 " Utility conn. : 2’ Lshl: 3" Lshh: 3" Pressure indicator: 1" c- 3rd&4th stage gas skid mounted knock out drum Design temp. min/max: -5/80 c Design press 4 barg Capacity: 3 m3 Gas inlet pipe size: 10" Gas outlet pipe size: 10" liquid outlet pipe size: 3" Drain: 3 " Utility conn. : 2’ Lshl: 3" Lshh: 3" Pressure indicator: 1" d- tank gas skid mounted knock out drums Design temp. min/max: -5/80 c Design press 4 barg Capacity: 3 m3 Gas inlet pipe size: 10" Gas outlet pipe size: 10" Liquid outlet pipe size: 3" Drain: 3 " Utility conn. : 2’ Lshl: 3" Lshh: 3" Pressure indicator: 1" e- cold flare skid mounted knock out drum Design temp. min/max: -5/80 c Design press: 50 barg Capacity: 10 m3 Gas inlet pipe size: 10" Gas outlet pipe size: 10" Liquid outlet pipe size: 3" Drain: 3 " Utility conn. : 2’ Lshl: 3" Lshh: 3" Pressure indicator: 1" |