Reference | NO 07/2013 |
Date | 6/10/2013 |
Location | Africa |
Scope | Replacement of logic control system (HEMA) - of the DCS system, Power Plant II: Including construction of operation station, new engineering station, removal of existing old cabin, laying of suspended cables between instrumentation on site and new DCS system, installation of electronic devices, and all works related to power supply system. |
Documents Price | 2,000 LD |