Reference | MTC 08\2013 |
Date | 6/24/2013 |
Location | Africa |
Scope | The company desires of release a project Replacement of corroded pipes and valves for fire water system in different locations inside and outside the main station of the field. The required replacement the followings: - The existing firewater main at facilities area. - The all underground piping. - Interconnecting pipe spools. - Valves. - Firewater main to the army camp |