Reference | MTC 23\2013 |
Date | 7/7/2013 |
Location | Africa |
Scope | The main purpose of the works covered herewith is completion on turnkey basis reconstruction, revamping, improvement and upgrading of the existing sewage system at the field, furnished the system with STP-Package plant and all processes for stabilize sludge or solids handling and sludge disposal, re-use and conveying the purified and disinfected water evaporation pond. |
Documents Price | 1000 Dinars .L.D |