Reference | GT13108800 |
Date | 8/18/2013 |
Location | Middle East |
Scope | Scope of work consist of replacement and /or installation of the following items at KN, KM, FM and Jaleha degassing stations 1.Replace the existing Hot Oil-Crude Oil Heat Exchangers with new design and changed configuration to allow for ease of scale removal by mechanical cleaning. Consider one 100% spare uninstalled tube bundle per exchanger to avoid production losses. 2.Install Chemical Injection Packages for corrosion inhibitor and provide injection points upstream to Hot Oil-Crude Oil Heat Exchangers. 3.Add a water wash (dilution bypass) from the first stage separator, effectively diluting the salt content to the point where it will not deposit in the hot oil heat exchanger. |
Bid Bond | QAR 2,750,000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QAR 500.00 |