Reference | 23 /2013 |
Date | 9/17/2013 |
Location | Africa |
Scope | Work program includes: - Replace delivery and export pipelines at Tanks 1, 2, 3 and 4 from tank nozzles to the meter bank. - Procure and deliver, pipelines, fittings, valves, expansion bellows, electrical cable and fittings, tape wrapping and instrumentation. - Relocate 6 booster pumps from inside the bunds to a new sheltered location outside the bunds. - Modify firewater and foam piping in order to install new equipment. - Install new fire protection concrete wall - Refurbish existing control valves - The following engineering requirements are to be included: ·CMCS detail engineering ·Cathodic protection engineering |
Bid Bond | (21,000) LD |
Documents Price | (1000) LD |