Scope |
Part 1 Storage and Distribution Facility The objective of this project (Part 1) is to provide a Front End Engineering Design (FEED) and EPIC tender package to enable QP to install a liquid nitrogen storage and distribution system of low and high pressure nitrogen required for Dukhan Operational Area and RG Plant based on continuous, intermittent and peak consumptions. A high pressure gaseous nitrogen cylinder filling facility shall also be provided to cater to the requirement for nitrogen in Dukhan operational areas.
Part 2 HP Cylinder Filling Facility The objective of this project (Part 2) is to carry out front end engineering design (FEED) services and prepare an EPIC tender package to install a Nitrogen Cylinder Filling facility to meet requirements of continuous, intermittent and peak consumptions in Dukhan. A liquid nitrogen storage and distribution facility shall also be installed that will cater to the requirement for Nitrogen in RG Plant and Dukhan operational areas.
|