Reference | RFP-221498 |
Date | 3/6/2014 |
Location | Middle East |
Scope | The Scope of Work includes construction of three new 132/11kV Substations (named, Sabriya „C?, Raudhatain „E? and Ratqa „C?) and its associated 132kV overhead power lines which are required to feed the industrial loads of Kuwait Oil Company. The Scope includes engineering, procurement, testing, construction, installation, pre-commissioning and commissioning of the Works as detailed in Contract documents, and is divided into the following three (3) Portions: Portion 1: EF/1906 - Sabriya „C? Substation and its related Overhead Power Lines Portion 2: EF/1907 - Raudhatain „E? Substation and its related Overhead Power Lines Portion 3: EF/1855 - Ratqa „C? Substation and its related Overhead Power Lines |
Bond Validity | 90 days |