Scope |
The scope of work includes upgrade of control system by replacing Allen Bradely SLC 5/05 PLCs and wonderware SCADA system in Dukhan Sewage Treatment Plant. CONTRACTOR shall carry out all design and engineering, supply all material, labour, services, supervision, testing devices, warehousing, equipment, tools, consumable materials and each and every item of expense necessary for upgrading the STP control system by replacing AB PLCs and wonderware SCADA workstations with equivalents at Dukhan STP and integrating all STP measurement and controls to the new SCADA system, on EPIC basis. |