Reference | GT14117400 |
Date | 12/21/2014 |
Location | Middle East |
Scope | The EPIC contractor shall carry out a full and detailed project works including risk analysis for the relocation of the SCADA control functionality of the GDS network from WHTP-B to WHTP-E/G and from WHTP-D to WHTP-H/L. This will enable full utilization of new control rooms at WHTP-E/G and WHTP-H/L for continuous monitoring of the GDS network and operations of WHTP plants. WHTP-E/G control room will be used as a main MOC, while WHTP-H/L will be used as a back up for GDS operations in event of any failure at WHTP-E/G control room. Station-N LOC shall be upgraded to MOC as a back up for GDS operations during emergency situations like SCADA failure at WHTP-H/L and WHTP E/G. Dismantled material shall be delivered to QP approved sites. The address to send the submissions is Contracts Dept. - Engineering Division, Qatar Petroleum, Fareej Bin Dirham, Al-Handasa Complex, Mezzanine Fl, Room A-M03, B-Ring Rd, Doha |
Bid Bond | QAR 1000000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QAR 500.00 |