Reference | GT14118000 |
Date | 12/17/2014 |
Location | Middle East |
Scope | Contractor shall carryout work including preliminary engineering verification, detail design, procurement, material supply, installation /construction, inspection, testing, pre-commissioning and commissioning (EPIC) for implementation of the following twelve (12) nos. mechanical plant change requests at QP's NGL 1,2 & 4 Plants in Mesaieed PCR number Description OEE/GP/13/428,, Provide catch pots for Caustic Sample Points,,,,,,,,,, 83-SC-012, 83-SC-013, 83-SC-023, 83SC-002 and ,,,,,,,,,,83-SC-001 OEE/GP/13/430,, Additional Safety Shower to be installed near the ,,,,,, ,,Caustic Sample Point 83-SC-015 at Disulphide Oil ,,,,,,,,Separator V-8303 OEE/GP/13/432,, Connection of V-8422/V-8432 Level Gauge and Level,,,,,, ,,Transmitter drains to closed drain system OEE/GP/13/438,, Provide Facility for diversion of liquid to ,,,,,,,,,, Off-spec Vessel during pigging Operation of 24" ,,,,,,,,Offshore line (NGL1/2) OEE/GP/13/443,,To provide new instrument air line to KT-8501 A/b ,,,,,, ,,Pulse Jet System OEE/GP/14/446,, Provide New Suction Strainer for K-2503 and,,,,,,,,,, K-2504 with DP Indication (NGSL) OEE/GP/14/453,,To Provide warm up line for the pumps in ,,,,,,,,,,,, Fractionation OEE/GPT/14/460,, Utility connection in fin fan platforms (NGL-4) OEE/GPT/14/461,,V-8505 Boot train to closed drain spade OEE/GPT/14/462,, Fractionation Analyzer Sample outlet line,,,,,,,,,,,, modification OEE/GPT/14/464,, Replacement of Cement Lines CS Sea Water Branches ,,,,,, ,,with GRE (Phase 2) OEE/GPT/14/467,,Safety shower near T-8201 |
Bid Bond | QAR 126000 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QAR 200.00 |