Reference | SDG5523P15/08 |
Date | 11/26/2014 |
Location | Asia |
Scope | Design, fabrication, supply, installation and commissioning of dehydration (pilot) plant (from10, 000 scmd natural gas). Design, Fabrication, Supply, Installation and Commissioning of a Pilot Plant for removal of heavier Hydrocarbons (C5+) and Saturated Water Vapors from 10,000 SCMD Natural Gas by Adsorption Process. |
Documents Price | USD 100.00 |