Reference | 0700040 |
Date | 12/23/2014 |
Location | Africa |
Scope | Provision of the Coil Tubing Services for Completion & Work over Operations starting second quarter of 2015 for Two (2) years firm period plus one (1) year optional extension. Scope of work: The Scope of Work shall include but not limited to the following: a. Nitrogen kickoff b. Perforation wash c. Well circulation d. Tubing clean out e. Pumping f. Fishing Equipment The Coil Tubing Equipment should be able to carry out all activities with minimum impact on the environment. The Equipment shall have the under listed basic Coil tubing specification to qualify for consideration. a. Coil tubing Reel minimum Length of 4500m b. Outer Coil tubing diameter of 1.5” c. Working pressure of 10,000 psi d. Conventional BOP : suitable for the Unit e. Injector Head: Suitable for 1.5” CT The Contract award strategy will be single award. |