Reference | GT15100421 |
Date | 1/22/2015 |
Location | Middle East |
Scope | The project study scope involves: - Replace the existing manual choke valves at production wellheads DK476, 478, 479, 475, 489 and 503 at Gas Recycling plant in Dukhan with automated choke valves operable remotely from plant DCS. - Provide necessary mechanical and piping modifications at the above mentioned wellheads for the installation of automated choke valves. - Provide necessary instrument and control system modifications at plant DCS and wellhead hydraulic control panels. - Modify the existing RTU and MTU for the above mentioned 6 production wells to provide the automated choke valves. - Project study scope is illustrated in the enclosed control schematic and marked up P&ID |
Bid Bond | QAR 300,000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QAR 500.00 |