Reference | LT15100800 |
Date | 2/17/2015 |
Location | Middle East |
Scope | Contractor shall carry out the Design and Detailed Engineering, Procurement, Installation, Construction, Integration, Pre-commissioning, Commissioning, testing and Start up of the facility for the replacement of Gas Chromatograph at QP Station A21 in Ras Laffan Industrial City. The Scope of Work requires Third Party Certification of the flow-metering skid after installation of Gas Chromatograph for the fiscal metering purpose. Duration of Contract is eighteen (18) calendar months. |
Bid Bond | QAR 25,000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QAR 200.00 |