Reference | GT15102800 |
Date | 3/16/2015 |
Location | Middle East |
Scope | QP Refinery intends to replace old 11kV, 3.3kV and 415V switchgears in sub-stations 3102-K, 3103-K and 415V switchgear in sub-station 2305-K that have been in service for thirty four (34) years and for which spare parts have become obsolete. Scope of work includes replacement including design, detailed engineering, procurement, installation, construction, testing, pre-commissioning and commissioning of switchgear at Off-site substations at QP Refinery, Mesaieed as given below: 1.,,Replacement of SWG 3110 11 kV in substation 3103K. 2.,,Replacement of SWG 3120 3.3 kV in substation 3103K. 3.,,Replacement of SWG 3130 415 V in substation 3103K. 4.,,Replacement of SWG 3101 11 kV in substation 3102K. 5.,,Retrofit of SWG 3221 3.3 kV in substation 3102K extension. 6.,,Replacement of SWG 3720 415 V in substation 3102K. 7.,,Replacement of LV SWG 415 V in Substation 2305K. |
Bid Bond | QAR 525,000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QAR 500.00 |