Reference | BID9065 |
Date | 9/6/2009 |
Location | Middle East |
Scope | Ref. No.: RFP-2033 Issue Date: 06-Sep-2009 Pre-Tender Meeting Date: 12-Oct-2009. Question Closing Date: 15-Dec-2009 Original Bid Closing Date: 07-Feb-2010 Extended Bid Closing Date: 21-Mar-2010, 20-Apr-2010 New Bid Closing Date: 27-Apr-2010 Bond Validity: (90) days from the Bid Closing Date Bid Bond: KD 200000 Scope of Work: This tender is devided into two parts: - Part I: EF/1713 Installation of Low Sulphur Fuel Oil (LSFO), FG and Gas Oil Pipelines from Mena Al Ahmadi to Sabiya & Doha Power Stations. - Part II: EF/1760 Installation of FG and Gas Oil Pipelines and Pumping Station from Mena Al Ahmadi to Azzour & Shuaiba Power Stations. This tender limited for the following companies: Aker Kvaerner, Bechtel Ltd UK, Chiyoda Corporation Japan, Daelim Industrial Co. Ltd. S. Korea, Foster Wheeler Energy Ltd UK, GS Engineering & Construction Corp, Hyundai Engineering & Construction Co. S. Korea, Hyundai Heavy Industries Korea, JGC Corporation Japan, KBR Overseas Operations Ltd KSA, Lurgi Oel-Gas-Chemie GMBH Germany, Petrofac International Ltd Sharjah UAE, Saipem S.A France, Saipem Spa Italy, SK Engineering & Construction Co. Ltd S. Korea, Technip France and Technip Spa Italy. |