Reference | LTC/C/VEN/2168/15 |
Date | 7/13/2015 |
Location | Middle East |
Scope | Contractor is required to carry out the Front End Engineering Design (FEED) study for the conversion of the existing QG1 simple gas turbine generators into a combined and cogeneration plant complete with all deem necessary auxiliary equipment in order to maintain and/or improve the current system reliability, to optimize the facility's fuel utilization efficiency and to reduce the facility's CO2 and NOx emissions. |
Documents Price | QAR 500.00 |