Reference | GT15112300 |
Date | 3/3/2016 |
Location | Middle East |
Scope | Contractor shall provide single jack-up Accommodation Barge with operational crew to support Shutdown activities at PS/2 and PS/3. to carry out the following Services: The accommodation barge shall carry out following tasks while performing the Services: a) Jacking up alongside the respective offshore installation and connecting a gangway to provide easy pedestrian access to such offshore installation. b) Providing accessible sleeping accommodation and catering services for Passenger(s) who will mainly consist of a labor force for QP engineering and offshore maintenance projects at the offshore installation. c) Providing workshop, cranage, warehousing and lay down storage and similar support facilities for the QP engineering and offshore maintenance projects. d) Providing a helideck and supply vessel mooring points for Passenger(s) and Cargo logistic support. Contract Duration shall be one hundred thirty one (131) days from Effective Date. |
Bid Bond | QAR 1,000,000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QAR 500.00 |