Reference | CDG1045P17 |
Date | 5/11/2016 |
Location | Asia |
Scope | The company proposes to acquire approximately 870 LKM of regional wide spaced 2D Seismic Data in the un-appraised areas of Assam-Arakan Sedimentary Basin, North-East India covering parts of Arunachal Pradesh & Assam (North Bank & South Bank of Brahmaputra River) by hiring the services of an internationally reputed and competent Contractor/Service Provider having requisite infrastructure and relevant experience in different parts of the world carrying out 2D Seismic Data Acquisition. The area of operations falls mainly in Arunachal Pradesh (covering North Bank & South Bank of Brahmaputra River) & partly in Assam. Most of the seismic lines are lying within Arunachal Pradesh and only few of them are extending to Assam passing across the state boundary of Assam & Arunachal Pradesh. The main part of the operational area in Arunachal Pradesh (both in North Bank & South Bank of Brahmaputra River) is predominantly covered by rocky/hilly terrain with steep slopes & cliffs and thick tropical forests/ river channels. The very small part of the operational area in Assam is relatively flat terrain with majority covered by villages/paddy fields. The area of operations consists: ? Hilly/Foothills Region with undulating topography/rapid elevation variation, ? Rocky terrain with steep slopes and cliffs, ? Logistically Difficult Areas having near surface pebbles, ? Boulder bed areas, ? Alluvium covered Foreland part, ? Close to river catchment areas, ? Areas with moderate to high vegetation/ thick tropical forest cover and inaccessibility in few parts The successful bidder shall deploy two (2) seismic crews, mobilize requisite technical resources along with experienced manpower & adopt terrain specific appropriate technology to meet the objective of the survey and complete the work strictly within the agreed time frame as stipulated in the contract. The Contractor shall ensure that seismic data acquisition work starts simultaneously by all the seismic crews planned to be deployed in the area of operations to meet the targets/time line of the Project. The Contractor shall use explosives, terrain specific shot hole drilling technology/methodology/rigs and project specific requisite technical resources along with experienced manpower to meet desired data quality in order to meet project objective. |
Bid Bond | USD 197,000.00 |
Bond Validity | 225 days |
Offer Validity | 120 days |
Documents Price | USD 1,000.00 |