Reference | GAIL/JP16/FL032/3400005372/15992/16-17 |
Date | 6/18/2016 |
Location | Asia |
Scope | The company invites bids for Procurement, Installation & Commissionig of Submersible Pump at Gail-Jamnagar SV Stations. The work mainly consists of Reboring / new boring as per the condition of existing bore or as per the instruction of EIC for new boring at all sites. Existing hand bore is available at (SV-2, 4, 5, 6) and New Boring at (SV -7, 71). Dismantling of Existing Hand pump if required, providing and Installation of submersible Pump complete in all respect as per the SOR & as per the direction of EIC. The Bidder is advised to visit the site before quoting his rates to assess the nature of work Non familiar with the site condition shall not be a reason for extra claim for increasing the item rates if any. It also includes Retrieval of old casing pipes wherever Reboring is done replacing with new casing pipes. The details are as follows:- - The drilling shall be carried out by the contractor at the site indicated at the specified location attached. - Deployment of required machine, Equipment, Tools & Tackles including support Vehicle, staff and transportation of the equipment material from one site to another site of work shall have to be carried out at his own cost. No payment shall be made for transportation charges to the contractor. - The water and power shall have to be arranged by the contractor at his own cost for drilling of bore. - Arrangement of water & power is in vendor scope - All risks and compensation consequent to accident or any account whatsoever will be the responsibility of the contractor alone. All losses on account of jamming and breaking of drilling tools & tackles will again be responsibility of the contractor .The payment of the bore well abandoned on these or any account will not be made. - Approachability of Drilling machine and support vehicle to the site of work will be the responsibility of the contractor .The department will not make any extra payment to the contractor on this account. - If during drilling or any other operation required for completion of work, any tools, steel wire ropes, pipes etc. fall down in the bore hole, the contractor shall take necessary fishing operation at his own cost. He shall use his own equipment for such operation. If the bore will become useless due to fallen any article it shall be treated as abandoned and no payment shall be made to the contractor for such abandoned tube well. - The bore holed drilled shall be perfectly vertical. - Supply & Installation of submersible pump with motor having specification 1.5 HP, single phase ,including all complete electrical & mechanical fitting wiring ,starters etc. is in the scope of contractor. - All fitting are ISI mark and supplied by the contractor. - Bore depth shall be done up to 250 feet approx. In case of non-availability of water bore depth shall be increased as per EIC instruction. - Control panel shall be installed inside in the electrical control room and the cabling wire shall be done underground from bore well to electrical room approx. 20 meter in contractor scope as per standard practice and as per EIC instruction. Cable shall be laid at 300mm depth inside PVC pipe. - Casing pipe to be installed in complete bore i.e. 250 feet. Bottom 200 feet shall be perforated type for filtering purpose. Balance 50 feet at top shall be normal UPVC pipe as in technical spec. |
Offer Validity | 93 days |