Reference | 815 |
Date | 9/6/2016 |
Location | Africa |
Scope | The company announces its need for: 1. Replacement of the entire existing fire fighting foam concentrates piping net work comprising carbon steel pipes, valves, fittings, bolts and nuts, steel support and all appurtenances that attached or included in the system. 2. Engineering work pertains to the firefighting in the system. 3. Procurement and fabrications of the new firefighting system. 4. NDT inspection of the new firefighting system. 5. Painting work. 6. Start and commissioning. |