Reference | 8000009796 |
Date | 8/3/2016 |
Location | Asia |
Scope | The company invites bids for the procurement of 95”-98”led display for corporate office, New Delhi. The Contractor’s scope of work shall include the following: i) System supply, installation, commissioning, configuration & integration of total solution as per the Bill of Material (BoM) including LED display and associated accessories, etc. given in the Scope of Work (SOW). ii) Extension & routing of AC input power cables from the company provided 230V AC power points to the input of the systems using suitable cables, connectors and Spike Protection Guards. The power cables shall be of suitable conductor size/dimension to limit any over heating and/or voltage drop. iii) All the cables, which are coming in and going out of the supplied equipment, shall have to be routed properly in the internal raceways/ vertical or horizontal planes along the wall. C-channels/cable trays of suitable dimension (matching the colour of walls) are to be used for the same. iv) Transportation & delivery of the total equipment and associated items at site as per BOM. v) Providing safety / security of the equipment, installation materials & test equipment etc. during the shipment, storage, installation & commissioning, till the systems are handed over to the company. vi) Site Acceptance Testing (SAT) covering the integration of the supplied Display with existing VC system/PC and thereafter commissioning of the complete system at site. vii) Providing comprehensive on-site warranty for the performance of all supplied items for the period of five (5) years & technical support during the warranty period in accordance with the specifications as specified in the bid document. During the warranty period, any software upgradation of the supplied system will be done without any cost implication to the company. viii) Under warranty, in case of any failure of the supplied items, the same shall be rectified / restored as per the resolution time from the placement of first service call without any cost implication. ix) Contractor shall arrange for the commissioning spares of all systems, sub-systems & equipment that may be required during the commissioning & warranty period separately at his own cost. x) Supply of one set of technical literature, drawings & documentation (as defined in Bidder Data Requirement) for the complete system. xi) The Contractor shall also carry out any other works (including supply) not mentioned above, but required for completing the work in totality. xii) The Contractor shall supply any additional cables (of sufficient length), connectors, converters, etc. for installing the systems at site with no additional cost implication to the company. The Contractor shall ensure proper routing of cables in C-channels and proper dressing considering the aesthetics of the room. |
Bid Bond | INR 55,000.00 |
Bond Validity | 150 days |
Offer Validity | 90 days |