Scope |
The company announces its need for Construction 36” Strategic Crude Supply Line from KNPC Manifold UPTO MAB Refinery Fence & Modification to Existing Crude Feed Lines to MAB & Shuaiba Refineries.
The contractor shall survey, design, carry out basic and detailed engineering, supply all temporary and permanent materials, equipment, facilities and manpower, perform all engineering, procurement and construction services required to construct, pre-commission/test, commission and performance tests and any other work which could reasonably be deemed as necessary to provide the Company with complete proven and operable facilities, in accordance with the technical specifications, drawings, data sheets, specifications and information furnished in this package and to restore the entire pipeline corridor and all associated facilities such as KNPC Manifold, Electrical Substations back to normal operation.
|