Egypt Zones accountACCOUNT
Construction of 36” Strategic Crude Supply Line
Oil and Gas Pipeline
Reference RFP-242033
Date 8/22/2016
Location Middle East
Scope The company announces its need for Construction 36” Strategic Crude Supply Line from KNPC Manifold UPTO MAB Refinery Fence & Modification to Existing Crude Feed Lines to MAB & Shuaiba Refineries.

The contractor shall survey, design, carry out basic and detailed engineering, supply all temporary and permanent materials, equipment, facilities and manpower, perform all engineering, procurement and construction services required to construct, pre-commission/test, commission and performance tests and any other work which could reasonably be deemed as necessary to provide the Company with complete proven and operable facilities, in accordance with the technical specifications, drawings, data sheets, specifications and information furnished in this package and to restore the entire pipeline corridor and all associated facilities such as KNPC Manifold, Electrical Substations back to normal operation.

Bidding Information

Bid Bond 2.5% from the bid value
Bond Validity 90 days
Documents Price KD 300.00
Oil and Gas Pipeline
Related Prooducts: Oil and Gas Pipeline General LNG Carriers LNG Terminal Natural Gas Storage Oil and Gas Pipeline Oil Storage Railways Tank Truck Tankers
Related Tenders: General LNG Carriers LNG Terminal Natural Gas Storage Oil and Gas Pipeline Oil Storage Tank Truck Tankers

Related Articles

For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.