Reference | HFY-CON/F&C0816-0840 |
Date | 8/29/2016 |
Location | Middle East |
Scope | The company announces its need for supply of provision of engineering, procurement, construction and commissioning (EPCC) of field surface facilities (FSF) project for production sustained in 2017. The scope of work includes Engineering, Procurement, Construction and Commissioning (EPCC) of 16 wellheads and 3 OGMs expansion to sustain production in 2017, which cover but not limited to: - Oil and gas wellhead system in 4 well pads. - Oil and gas gathering flowlines (Pipelines supplied by PCH). - Expansion of 3 Oil Gathering Manifolds (OGM). - Instrument control system. - Electrical supply system. - Water supply and drainage system. - Civil, Structure and Architecture works. - Communication System. - Fire Fighting facilities. - Cathodic protection system. |
Documents Price | US 100.00 |