Reference | 071/SC/16 |
Date | 10/4/2016 |
Location | Middle East |
Scope | The company announces its need for provision of workover rig rental service with three set of workover rigs. 1- Provide three set of 650HP land workover rigs no more than 9 years old equipped with maximum 7000 psi and 1500L/min Mud Pump, Maximum workover depth at least 4600m with 2 7/8” drill pipe, comprehensive operation ability is no less than 140Ton, and 5000psi complete BOP system. 2- Provide qualified crew and personnel with good experience in the international market, and it will be better who has experience especially in the Middle East and Iraq. 3- Provide one fixed year and one optional year service for workover that the main operation included but not limited as following: - Perforation and Re-perforation completion; - New ESP completion; - ESP inspection and reparation; - Water shut-off or profilecontrol; - Tubing check with injection wells; - Workover or downhole remedial operation; 4- The supplier shall build their base camp and provide catering service for all personnel on Company’s working site; all relevant cost will be charged by themselves. 5- The supplier shall be responsible for their own mobilization and demobilization and the relative business between the origin of the rig and Al-Waha Ahdeb oilfield. 6- The supplier shall provide armored vehicle at their own cost to transport their expatriate staff between their base camp and working site. 7- Spud the first well in March of 2017 8- The else. |