Reference | CMIT-PRT-10.30-150175-1 |
Date | 11/22/2016 |
Location | Middle East |
Scope | The company announces its need for EPC for Water Discharging Pond. The EPC Contractor is required to build a 30000 m3 Water Discharging Pond used for receiving the discharged water from the WTP when it was shutdown. The scope also include the oily water circulate system and other accessories. |
Documents Price | US 100.00 |