Reference | GT16109100 |
Date | 12/4/2016 |
Location | Middle East |
Scope | The company invites all prospective suppliers and contractors for EPIC for Replacement of Crude Oil Transfer Lines at Dukhan. The Scope of Work for this Project includes Engineering , Procurement, Construction, Commissioning of Crude Transfer lines in Dukhan as detailed below: 1- Construction of new 10" diameter aboveground pipeline between KSDS and KMDS (approximately 5.3km). Decommissioning/ Demolition of existing 12" diameter MOL (4.4km). 2- Construction of new 10" diameter aboveground pipeline between FNDS and FMDS (approximately 5.1km). Decommissioning/ Demolition of existing 10" diameter MOL (5.2km). 3- Construction of new 10" diameter aboveground pipeline between FSDS and FMDS (approximately 8.1 km). Decommissioning/ Demolition of existing 12" diameter MOL (6.4km). 4- Construction of the Main Oil Lines related facilities (Pig Launcher / Receiver, valves, Fittings, Supports etc.) 5- A new Pipeline Monitoring System/Leak Detection System (LDS) shall be provided for the new pipelines. 6- New field instruments, including F&G detectors for local and remote monitoring, control and safeguarding of new pipelines shall be provided. 7- Carry out all modifications related to Process, Mechanical, Piping, Instrumentation, Electrical, Civil/Structural, Environmental and Loss Prevention works. 8- Carry out all the necessary modification for the utility systems. 9- The existing condensate lines /oily water lines (from WHTPs and other plants) shall be extended to connect to respective new MOL pipelines from the nearest point after duly blinding the tie-in point at the existing MOL pipelines. |
Bid Bond | QR 1,500,000.0 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QR 500.00 |