Scope |
The company invites all prospective suppliers and contractors for PIC for Three (3) PCRs.
Under this contract, contractor shall carryout supply, installation/construction, testing and commissioning of the following three (3) Nos. Plant Change Requests (PCRs) : #1,,64-14-006,,Replacement of old 6409J/JA plunger pumps with high speed centrifugal pumps at QP Refinery #2,,22-14-001,,Install new emergency cooling water pump in the cooling tower with the same capacity of existing pumps #3,,45-11-001,,To provide On-Off pump and piping to transfer KO drum liquid from 4507F to 4505F. Which shall be performed in accordance with the Scope of Work, standards, specifications, codes and requirements and shall also be consistent under good international engineering approved practices. |