Reference | HFY-CON/F&C0833-0857 |
Date | 11/28/2016 |
Location | Middle East |
Scope | The company announces its need for provision of Engineering, Procurement, Construction and Commissioning for Additional Wells Tie-In of FSF for Y2017 200kbopd Sustained Production. The project shall cover, but not limited as below: a)3 OGMs,19 new wellheads facilities (17 new wells + 2 water source wells) and 1 existing wellhead modification, covering piping, instrumentation and other disciplines; b)Diesel Power Generators, Power distribution system and Well Pad Lighting; c)Instrumentation and Control System; d)Telecommunication System; e)DCS & SSS system for CPF1 and CPF2 inlet manifold expansion to accommodate more well tie-in in future; f)RTU expansion for future sustained production of existing PADs connected to CPF1 and CPF2; g)Civil/Structure works; h)Chemical injection skid in GRS1 according to MOC’s requirement i)Oil and gas gathering flowlines, trunklines; j)Cathodic protection system; k)CPF1 inlet manifold expansion. |
Documents Price | US 100.00 |