Egypt Zones accountACCOUNT
Provision of Rental Gas Turbine Power Plant
Generators
Reference HFY-CON/PS0826-0850
Date 1/15/2017
Location Middle East
Scope The company announces its need for Provision of Rental Gas Turbine Power Plant to Mitigate the Initial Power Requirement for Phase 3.

Rental of gas turbine generator Power Plant with capacity of generating 60 MW load on continuous basis at maximum ambient temperature of 55 °C & with available fuel gas specification at Halfaya site. The Rental Power Plant will consist of heavy duty industrial gas turbine generators and BOP part, mainly including gas treatment system, Instrument air, open drain and close drain system, venting system, water supply and drainage system, piping system, EDG (Plant shall self-start from black start), switch gears & power distribution system, fire protection and suppression system, instrumentation system, telecommunication system etc. inside the rental power plant. Operation & Maintenance of the plant including manpower on 24 hours x 7days basis, spare parts and consumable.

Bidding Information

Documents Price US 100.00
Generators
Related Prooducts: Generators Diesel Engine Engine Parts General Generating Sets Generators Marine Diesel Engine Power Pack Turbines (General) Turbines: Gas Turbines: Hydro Turbines: Steam
Related Tenders: Diesel Engine Engine Parts General Generating Sets Generators Marine Diesel Engine Power Pack Turbines (General) Turbines: Gas Turbines: Steam

Related Articles

For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.