Reference | CMIT-PRT-10.30-170042 |
Date | 3/15/2017 |
Location | Middle East |
Scope | The company announces its need for Vessel Clean up for DGS. This project covers vessel clean up in 9 Degassing Stations, it consists of test separators (TS), first stage separators (S1), second stage separators (S2), third stage separators (S3) and the fire water tanks (FWT) in each DGS. The total amount of 26 separators and 9 fire water tanks are needed to be cleaned. |
Documents Price | US 100.00 |