Reference | 9900010486 |
Date | 5/3/2017 |
Location | Middle East |
Scope | The company announces its need for EPCC of Fixed Firefighting System for Coke Drum Structure at DCU – SRIP. EPCC (Engineering, Procurement, Construction & Commissioning) of fixed firefighting system for coke drum structure of DCU (Delayed Coker Unit) in SRIP (Sohar Refinery Improvement project). The ROOMs shall be installed at following approximate elevations:23 meter, 30 meter and 60 meter. The firefighting system includes Remote Operated Oscillating Monitors (ROOMs), Fire Water Tank of minimum 3000 M3 capacity, fire water pumps, detection and activation system, piping, electrical, instrumentation, civil and structural work. All the material shall be UL certified and meet NFPA 20 requirements. |
Documents Price | OMR 385.00 |