Reference | HFY-CON/F&C0926-0950 |
Date | 10/16/2017 |
Location | Middle East |
Scope | The company announces its need for Provision of Engineering, Procurement, Construction and Commissioning for Early Tie-In Sustaining Production 250kbopd. This project contains twenty-three (23) wellheads located in two (2) new pads, nine (9) existing pads and eight (8) OGM and relative flowlines. The project shall cover, but not limited as below: - Oil and gas wellhead facilities covering piping and instrumentation and other disciplines. - Power distribution system and Well Pad Lighting, and installation of diesel Power Generators. - Instrumentation and Control System. - Telecommunication System. |
Documents Price | US 100.00 |