Scope | The company announces its need for Provision of EPCC for Existing Pilot Gas Lifting System Expansion. This project mainly includes two parts, which are as follows: 1- Existing Gas Lifting Station Expansion the following main process facilities in gas lifting station are included: - Evaporative Air Cooler Inlet Separator (V-12711) - Evaporative Air Cooler Skid (SK-12710) - High Pressure Separator(V-12712) - TEG Dehydration Package (PK-12720) - Fresh Water Treatment Package (PK-14190) 2- Gas Lifting Wells Tie-in the following scope will be included: - Newly built Trunklines & Flowlines: The newly built trunkline will tie-in from existing provision of connection at PAD HF-008, then distribute to each well. - Newly built Gas Lifting Well Facilities: 16 wells in 7 pads/OGMs |